Location: Portland, OR

MFA developed a design that integrated the demands of dynamic river flow, areas of hard and soft riverbed, bank stability, site operations, habitat improvements, and remedy requirements into a multi-component sediment and bank cap. MFA oversaw this multiphased construction, moving more than 200,000 cubic yards, to complete the remedy within the four month in-water work window.

See the trailer below about our movie describing remediation at Zidell. Then, watch the full 30-minute film for an understanding of the investigation and remediation work at the site, its past use, and its potential for future development.